Land · Dunn County · T144N R96W

Section 10Township 144 North, Range 96 West

2 spacing units cover this section. The Industrial Commission signed 3 orders on them between 2015 and 2026, and 1 of those changed something.

At a glance

T144N R96WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 2,560-acre unit · sections 2, 3, 10 and 11
  • 2,560-acre unit · sections 3, 4, 9 and 10
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section22,560 acres
Orders on record32015 to 2026; 1 changed something, 2 restated the rules
Horizontal wells with laterals in that unit44 active; started 2006 to 2007
Laterals that still fit1in 1 of the units; a count of space, not a plan

What happened on this land

The 2,560-acre unit over sections 2, 3, 10 and 11 was set up in 2015. 4 horizontal wells have laterals in it, started between 2006 and 2007.

  1. 2015
  2. Jan 2, 2015Unit set up

    Set up the 2,560-acre unit over sections 2, 3, 10 and 11.

    Set up the 2,560-acre unit over sections 3, 4, 9 and 10.

    Order 24874 · Case 22540 · Applicant: XTO Energy Inc.

2 more orders restated the rules without changing them
  • Jan 2, 2015: Order 24942 (case 22607), Marathon Oil Co.
  • Sep 17, 2026: Order 35805 (case 32879), Phoenix Operating LLC

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

2,560 acresSections 2, 3, 10 and 11

Set up
Jan 2015 · Order 24874
Last real change
Jan 2015
Wells with laterals inside
4
Pool
Murphy Creek-Bakken

2,560 acresSections 3, 4, 9 and 10

Set up
Jan 2015 · Order 24874
Last real change
Jan 2015
Wells with laterals inside
5
Laterals that still fit
1
Pool
Murphy Creek-Bakken

Wells in the 2,560-acre unit over sections 2, 3, 10 and 11

Horizontal wells with at least 660 ft of lateral inside sections 2, 3, 10 and 11, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology