NDIC file 11984 · API 33-053-02158-00-00
SILURIAN UNIT 52-1
Operated by TEXACO INC. · McKenzie County, North Dakota
Well facts
- Operator
- TEXACO INC.
- Status
- Permit cancelled (PNC)
- Well type
- Oil and gas (OG)
- Field
- CHARLSON
- Total depth
- 0 ft
- Legal location
- SWSW Sec 5 T153N R95W
- Footages
- 1,259 ft FSL · 1,100 ft FWL
- County
- McKenzie County
- NDIC file no.
11984- API no.
33-053-02158-00-00
Location & navigation
48.09947, -102.93166
Published surface location (NAD83). A horizontal well's lateral can run up to three miles from this point.
See it in 3D
Production
This well does not appear on its own in the NDIC Monthly Production Reports for Jan 2003 to Aug 2026, which list every well that reported in a month. Before May 2015 a well in a unitized pool was listed only inside its unit's total, so such a well does not appear on its own in those years either.
Nearby wells
- MCKENZIE COUNTY (NCT-1) 1TEXACO INC. · Plugged and abandoned (PA)106 ft
- CHARLSON USA 5C-2-3PETRO-HUNT, L.L.C. · Plugged and abandoned (PA)211 ft
- MCKENZIE COUNTY 6D-4-4HPETRO-HUNT, L.L.C. · Active (A)528 ft
- CHARLSON-MADISON NORTH UNIT C-105TEXACO EXPLORATION & PRODUCTION INC. · Plugged and abandoned (PA)739 ft
- CMNU C-205PETRO-HUNT, L.L.C. · Plugged and abandoned (PA)1,109 ft
- CMNU D-205PETRO-HUNT, L.L.C. · Plugged and abandoned (PA)1,162 ft
- CMNU C-205XPETRO-HUNT, L.L.C. · Permit cancelled (PNC)1,162 ft
- CHARLSON MADISON NORTH UNIT B205 XHPETRO-HUNT, L.L.C. · Permit cancelled (PNC)0.4 mi
Closest published well heads within 3 miles; wells on one pad share a location.
Other published attributes (1)
| symbol | PNC-OG |
|---|
DMR shapefile columns not shown above, unchanged.
Well records: North Dakota Industrial Commission, Department of Mineral Resources, Oil and Gas Division, public GIS download retrieved 2026-11-26. NDIC codes are shown with our plain-language reading. Locations are published well heads; laterals can run miles from them. Independent project, not affiliated with NDIC.
Source data · Methodology · Code · built 2026-11-26