More views of this land
Operators of the wells in the 645-acre unit, by name:
- D90 Energy, LLC
- Wy Basin Operating LLC
What happened on this land
The 645-acre unit was set up as a permanent unit in 2010. Orders in 2010 and 2011 allowed more horizontal wells (up to 1 more and up to 2 more). 7 horizontal wells have laterals in it, started between 1996 and 2012.
- 2010
- Dec 2, 2010Permanent unit
Set up a permanent spacing unit across section 8.
Order 272-2010 · Docket 337-2010 · Applicant: Taqa North USA, Inc · The Board's copy ↗
- Dec 2, 2010More wells allowed
Allowed up to 1 more horizontal well in the 645-acre unit.
Order 274-2010 · Docket 339-2010 · Applicant: Taqa North USA, Inc · The Board's copy ↗
- 2011
- Oct 13, 2011More wells allowed
Allowed up to 2 more horizontal wells in the 645-acre unit.
Order 328-2011 · Docket 397-2011 · Applicant: Taqa North USA, Inc · The Board's copy ↗
Wells in the 645-acre unit
Horizontal wells with at least 660 ft of lateral inside section 8, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
- McKinnon 1HWy Basin Operating LLC · Shut In · started 1996 · 2,457 ft of path inside · API 25-091-21710
- Hellegaard 5HD90 Energy, LLC · Shut In · started 2003 · 4,930 ft of path inside · API 25-091-21774
- M. Hellegaard A-2HWy Basin Operating LLC · Shut In · started 2003 · 3,393 ft of path inside · API 25-091-05165
- Hellegaard 8-8HWy Basin Operating LLC · Producing · started 2010 · 4,454 ft of path inside · API 25-091-21880
- Hellegaard 9-12HD90 Energy, LLC · Shut In · started 2010 · 4,452 ft of path inside · API 25-091-21869
- Hellegaard 9-13H-2Wy Basin Operating LLC · Producing · started 2012 · 4,626 ft of path inside · API 25-091-21921
- Hellegaard 8-1H-2Wy Basin Operating LLC · Producing · started 2012 · 4,432 ft of path inside · API 25-091-21923
Sources and limits
- Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
- A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
- Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
- Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
- Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
- Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.
- Not legal, engineering or investment advice. Corrections: see contact.
Built November 25, 2026. Find another section · The Bakken in Montana · Methodology