More views of this land
Operators of the wells in the 2,561-acre unit, by name:
What happened on this land
The 2,561-acre unit was set up as a temporary spacing unit in 2025. An order in 2025 allowed more horizontal wells (up to 3 more). 6 horizontal wells have laterals in it, started between 2007 and 2013.
- 2025
- Aug 14, 2025Temporary unit
Set up a temporary spacing unit across sections 8, 9, 10 and 11 for a horizontal well.
Order 186-2025 · Docket 246-2025 · Applicant: Oasis Petroleum North America LLC · The Board's copy ↗
- Aug 14, 2025More wells allowed
Allowed up to 3 more horizontal wells in the 2,561-acre unit.
Order 187-2025 · Docket 247-2025 · Applicant: Oasis Petroleum North America LLC · The Board's copy ↗
Wells in the 2,561-acre unit
Horizontal wells with at least 660 ft of lateral inside sections 8, 9, 10 and 11, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
- Briske 4-9HProduced Water Solutions, Inc. · P&A - Approved · started 2007 · 6,042 ft of path inside · API 25-085-21709
- BrianM 2958 43-10HOasis Petroleum North America LLC · Producing · started 2013 · 4,967 ft of path inside · API 25-085-21912
- Pinehurst 2958 24-11 4BOasis Petroleum North America LLC · Permit to Drill · 20,695 ft of path inside · API 25-085-22172
- Pinehurst 2958 24-11 2BOasis Petroleum North America LLC · Permit to Drill · 20,640 ft of path inside · API 25-085-22170
- Pinehurst 2958 24-11 3BOasis Petroleum North America LLC · Permit to Drill · 20,625 ft of path inside · API 25-085-22171
- Augusta 2958 24-11 5BOasis Petroleum North America LLC · Permit to Drill · 14,798 ft of path inside · API 25-085-22174
Sources and limits
- Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
- A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
- Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
- Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
- Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
- Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.
- Not legal, engineering or investment advice. Corrections: see contact.
Built November 25, 2026. Find another section · The Bakken in Montana · Methodology