More views of this land
Operator of the wells in the 1,289-acre unit, by name:
What happened on this land
The 1,289-acre unit was set up as a temporary spacing unit in 2010, made a permanent unit in 2013 and pooled in 2015. An order in 2013 allowed more horizontal wells (up to 4 more). 5 horizontal wells have laterals in it, started between 2011 and 2014.
- 2010
- Aug 12, 2010Temporary unit
Set up a temporary spacing unit across sections 16 and 21 for a horizontal well.
Order 156-2010 · Docket 121-2010 · Applicant: Zenergy Operating Company, LLC · The Board's copy ↗
- 2013
- Jun 6, 2013Permanent unit
Made the 1,289-acre unit a permanent spacing unit.
Order 219-2013 · Docket 234-2013 · Applicant: Oasis Petroleum, Inc · The Board's copy ↗
- Jun 6, 2013More wells allowed
Allowed up to 4 more horizontal wells in the 1,289-acre unit.
Order 220-2013 · Docket 235-2013 · Applicant: Oasis Petroleum, Inc · The Board's copy ↗
- 2015
- Apr 30, 2015Pooled
Pooled the 1,289-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 83-2015 · Docket 74-2015 · Applicant: Oasis Petroleum, Inc · The Board's copy ↗
- Apr 30, 2015Pooled
Pooled the 1,289-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 84-2015 · Docket 75-2015 · Applicant: Oasis Petroleum, Inc · The Board's copy ↗
- Apr 30, 2015Pooled
Pooled the 1,289-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 85-2015 · Docket 76-2015 · Applicant: Oasis Petroleum, Inc · The Board's copy ↗
- Apr 30, 2015Pooled
Pooled the 1,289-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 86-2015 · Docket 77-2015 · Applicant: Oasis Petroleum, Inc · The Board's copy ↗
1 more order restated the rules without changing them
Wells in the 1,289-acre unit
Horizontal wells with at least 660 ft of lateral inside sections 16 and 21, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
- Lonetree 2758 43-9HOasis Petroleum North America LLC · Completed · started 2011 · 10,133 ft of path inside · API 25-085-21813
- Sage Brush 2758 43-9HOasis Petroleum North America LLC · Producing · started 2012 · 11,475 ft of path inside · API 25-085-21890
- Sage Brush 2758 41-9 #2BOasis Petroleum North America LLC · Producing · started 2014 · 11,094 ft of path inside · API 25-085-21930
- Sage Brush 2758 41-9 #4BOasis Petroleum North America LLC · Producing · started 2014 · 10,817 ft of path inside · API 25-085-21932
- Sage Brush 2758 41-9 #3TOasis Petroleum North America LLC · Producing · started 2014 · 10,211 ft of path inside · API 25-085-21931
Sources and limits
- Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
- A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
- Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
- Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
- Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
- Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.
- Not legal, engineering or investment advice. Corrections: see contact.