The 1,281-acre unit was set up as a temporary spacing unit in 2011. A later order vacated the orders that set it up. 1 horizontal well has laterals in it.
2011
Apr 28, 2011Temporary unit
Set up a temporary spacing unit across sections 30 and 31 for a horizontal well.
Order 96-2011 · Docket 130-2011 · Applicant: EOG Resources , Inc · The Board's copy ↗
2024
Dec 5, 2024Temporary unit
Set up a temporary spacing unit across sections 30 and 31 for a horizontal well.
Order 149-2024 vacated the orders that set up the 1,281-acre unit.
Allowed up to 3 more horizontal wells in the 2,515-acre unit.
Order 150-2024 · Docket 184-2024 · Applicant: Kraken Oil & Gas LLC · The Board's copy ↗
The units that cover it
Montana lays new units over older ones, so one section can sit in several. Oil totals overlap for the same reason.
1,281 acresSections 30 and 31
An order ended this unit.
Drawn from the orders' land description; Montana has no spacing-unit map layer.
Temporary unit
Apr 2011 · Order 96-2011
Last real change
Dec 2024
Wells with laterals inside
1
Formation
Bakken/Three Forks
2,515 acresSections 30 and 31
The unit also takes in sections 6, 7 of T26N R57E.
Drawn from the orders' land description; Montana has no spacing-unit map layer.
Temporary unit
Dec 2024 · Order 149-2024
Orders allowing more wells
up to 3 more (2024)
Last real change
Dec 2024
Wells with laterals inside
1
Formation
Bakken/Three Forks
Wells in the 1,281-acre unit
Horizontal wells with at least 660 ft of lateral inside sections 30 and 31, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
Satchel 2657-7-30 #11HKraken Operating, LLC · Permit to Drill · 10,483 ft of path inside · API 25-083-23540
Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.