Operator of the wells in the 1,911-acre unit, by name:
What happened on this land
The 1,911-acre unit was set up as a temporary spacing unit in 2019, made a permanent unit in 2022 and pooled in 2022. An order in 2019 allowed more horizontal wells (up to 3 more). 3 horizontal wells have laterals in it, started between 2010 and 2022.
- 2019
- Oct 10, 2019Temporary unit
Set up a temporary spacing unit across section 36 for a horizontal well.
Order 81-2019 · Docket 96-2019 · Applicant: Continental Resources, Inc · The Board's copy ↗
- Oct 10, 2019More wells allowed
Allowed up to 3 more horizontal wells in the 1,911-acre unit.
Order 83-2019 · Docket 97-2019 · Applicant: Continental Resources, Inc · The Board's copy ↗
- 2022
- Oct 13, 2022Permanent unit
Made the 1,911-acre unit a permanent spacing unit.
Order 93-2022 · Docket 103-2022 · Applicant: Continental Resources, Inc · The Board's copy ↗
- Oct 13, 2022Pooled
Pooled the 1,911-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 94-2022 · Docket 104-2022 · Applicant: Continental Resources, Inc · The Board's copy ↗
Wells in the 1,911-acre unit
Horizontal wells with at least 660 ft of lateral inside section 36, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
- Tolksdorf 1-1HContinental Resources Inc · Shut In · started 2010 · 20,334 ft of path inside · API 25-083-22855
- Tolksdorf 2-12HContinental Resources Inc · Producing · started 2022 · 30,923 ft of path inside · API 25-083-23373
- Tolksdorf 3-12HContinental Resources Inc · Producing · started 2022 · 18,936 ft of path inside · API 25-083-23374
Sources and limits
- Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
- A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
- Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
- Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
- Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
- Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.
- Not legal, engineering or investment advice. Corrections: see contact.
Built November 25, 2026. Find another section · The Bakken in Montana · Methodology