More views of this land
Operators of the wells in the 1,280-acre unit, by name:
What happened on this land
The 1,280-acre unit was set up as a permanent unit in 2013 and pooled in 2013. An order in 2013 allowed more horizontal wells (up to 3 more). 5 horizontal wells have laterals in it, started between 1997 and 2013.
- 2013
- Jun 6, 2013Permanent unit
Set up a permanent spacing unit across sections 24 and 25.
Order 260-2013 · Docket 275-2013 · Applicant: Whiting Oil And Gas Corporation · The Board's copy ↗
- Jun 6, 2013Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 261-2013 · Docket 276-2013 · Applicant: Whiting Oil And Gas Corporation · The Board's copy ↗
- Jun 6, 2013More wells allowed
Allowed up to 3 more horizontal wells in the 1,280-acre unit.
Order 262-2013 · Docket 277-2013 · Applicant: Whiting Oil And Gas Corporation · The Board's copy ↗
- 2014
- May 1, 2014Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 98-2014 · Docket 100-2014 · Applicant: Whiting Oil And Gas Corporation · The Board's copy ↗
- May 1, 2014Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 99-2014 · Docket 101-2014 · Applicant: Whiting Oil And Gas Corporation · The Board's copy ↗
- May 1, 2014Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 100-2014 · Docket 102-2014 · Applicant: Whiting Oil And Gas Corporation · The Board's copy ↗
Wells in the 1,280-acre unit
Horizontal wells with at least 660 ft of lateral inside sections 24 and 25, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
- Baxter 24-24HMorningstar Operating LLC · P&A - Approved · started 1997 · 3,898 ft of path inside · API 25-083-21852
- Mullin 21-24-4HWhiting Oil And Gas Corporation · Producing · started 2013 · 10,737 ft of path inside · API 25-083-23185
- Mullin 21-24-3HWhiting Oil And Gas Corporation · Producing · started 2013 · 9,836 ft of path inside · API 25-083-23184
- Mullin 21-24-1HWhiting Oil And Gas Corporation · Producing · started 2013 · 9,452 ft of path inside · API 25-083-23110
- Mullin 21-24-2HWhiting Oil And Gas Corporation · Producing · started 2013 · 9,409 ft of path inside · API 25-083-23183
Sources and limits
- Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
- A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
- Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
- Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
- Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
- Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.
- Not legal, engineering or investment advice. Corrections: see contact.
Built November 25, 2026. Find another section · The Bakken in Montana · Methodology