Operator of the wells in the 1,281-acre unit, by name:
What happened on this land
The 1,281-acre unit was set up as a temporary spacing unit in 2004 and made a permanent unit in 2005. Orders in 2006 and 2008 allowed more horizontal wells (up to 1 more and up to 1 more). 3 horizontal wells have laterals in it, started between 2004 and 2008.
- 2004
- Sep 16, 2004Temporary unit
Set up a temporary spacing unit across sections 27 and 34 for a horizontal well.
Order 216-2004 · Docket 250-2004 · Applicant: Lyco Energy Corporation · The Board's copy ↗
- 2005
- Apr 28, 2005Permanent unit
Made the 1,281-acre unit a permanent spacing unit.
Order 115-2005 · Docket 142-2005 · Applicant: Lyco Energy Corporation · The Board's copy ↗
- 2006
- May 4, 2006More wells allowed
Allowed up to 1 more horizontal well in the 1,281-acre unit.
Order 157-2006 · Docket 200-2006 · Applicant: Enerplus Resources (USA) Corporation · The Board's copy ↗
- 2008
- Jan 31, 2008More wells allowed
Allowed up to 1 more horizontal well in the 1,281-acre unit.
Order 5-2008 · Docket 7-2008 · Applicant: Enerplus Resources (USA) Corporation · The Board's copy ↗
Wells in the 1,281-acre unit
Horizontal wells with at least 660 ft of lateral inside sections 27 and 34, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
- Olive-LeSueur 27-4HMorningstar Operating LLC · Producing · started 2004 · 9,590 ft of path inside · API 25-083-22214
- Olive-Volden 27-2HMorningstar Operating LLC · Producing · started 2006 · 9,652 ft of path inside · API 25-083-22497
- Olive-Arlene 27-3-HLID3Morningstar Operating LLC · Producing · started 2008 · 9,593 ft of path inside · API 25-083-22740
Sources and limits
- Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
- A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
- Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
- Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
- Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
- Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.