More views of this land
Operator of the wells in the 640-acre unit, by name:
What happened on this land
The 640-acre unit was set up as a temporary spacing unit in 2012, made a permanent unit in 2013 and pooled in 2013. An order in 2013 allowed more horizontal wells (up to 4 more). 1 horizontal well has laterals in it, started in 2012.
- 2012
- Apr 26, 2012Temporary unit
Set up a temporary spacing unit across section 22 for a horizontal well.
Order 151-2012 · Docket 200-2012 · Applicant: Slawson Exploration Company, Inc · The Board's copy ↗
- 2013
- Apr 25, 2013Permanent unit
Made the 640-acre unit a permanent spacing unit.
Order 174-2013 · Docket 93-2013 · Applicant: Slawson Exploration Company, Inc · The Board's copy ↗
- Apr 25, 2013Pooled
Pooled the 640-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 175-2013 · Docket 94-2013 · Applicant: Slawson Exploration Company, Inc · The Board's copy ↗
- Apr 25, 2013More wells allowed
Allowed up to 4 more horizontal wells in the 640-acre unit.
Order 176-2013 · Docket 95-2013 · Applicant: Slawson Exploration Company, Inc · The Board's copy ↗
Wells in the 640-acre unit
Horizontal wells with at least 660 ft of lateral inside section 22, oldest first. Wells of any formation are listed. A well's name opens it in the 3D viewer.
- Sentinel 1-22HSwanson Oil & Gas LLC · Producing · started 2012 · 4,667 ft of path inside · API 25-083-22904
Sources and limits
- Read by machine, not checked by a person. Order facts come from the orders of the Montana Board of Oil and Gas Conservation, as the Board posts them for each hearing, 2000 through the hearing of October 15, 2026. The signed order is the rule; each order links to the Board's own copy.
- A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
- Montana's steps. The Board sets up a temporary spacing unit for a first horizontal well, then a permanent unit once the well produces, and can pool the owners. A well-density order allows up to a stated number of wells more; the pages show each number as the order states it and do not add them up.
- Bakken and Three Forks orders only, granted, and only where the order describes its land by section numbers. Orders that name the same sections make one unit. Orders from before 2000 are not on these pages yet.
- Outlines are drawn from each order's land description on the federal section grid (BLM, fetched November 25, 2026); Montana has no spacing-unit map layer. A unit that crosses a township line is listed in each township it touches.
- Wells come from the Board's well list (November 18, 2026): horizontal wells with at least 660 ft of the Board's simplified well path inside a unit, whatever formation they produce from. Oil is as reported in the Board's well-by-well production file, January 2003 to August 2026. Overlapping units count the same barrels. A well's status is the Board's word, not a judgement.
- Not legal, engineering or investment advice. Corrections: see contact.