Land · Divide County · T161N R102W

Section 31Township 161 North, Range 102 West

2 spacing units cover this section. The Industrial Commission signed 2 orders on them between 2025 and 2026.

At a glance

T161N R102WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,920-acre unit · sections 19, 30 and 31
  • 3,840-acre unit · sections 19, 20, 29, 30, 31 and 32
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section21,920 and 3,840 acres
Orders on record22025 to 2026; 2 changed something, 0 restated the rules
Most wells an order allows in the 1,920-acre unit5stated in 2025
Laterals that still fit6in these units; a count of space, not a plan

What happened on this land

The 1,920-acre unit was set up in 2025, with 5 horizontal wells allowed.

2420265 wellsMost horizontal wells an order has allowed
The 1,920-acre unit (sections 19, 30 and 31). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2025
  2. Oct 9, 2025Unit set up

    Set up the 1,920-acre unit across sections 19, 30 and 31, with up to 5 horizontal wells allowed.

    Order 34628 · Case 31886 · Applicant: KODA Resources Operating, LLC

  3. 2026
  4. Oct 14, 2026Unit set up

    Set up the 3,840-acre unit across sections 19, 20, 29, 30, 31 and 32.

    Order 35874 · Case 32945 · Applicant: KODA Resources Operating, LLC

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,920 acresSections 19, 30 and 31

Set up
Oct 2025 · Order 34628
Most wells an order allows
5 · 2025
Last real change
Oct 2025
Wells with laterals inside
0
Laterals that still fit
4
Pool
Daneville-Bakken

3,840 acresSections 19, 20, 29, 30, 31 and 32

Set up
Oct 2026 · Order 35874
Last real change
Oct 2026
Wells with laterals inside
1
Laterals that still fit
2
Pool
Daneville-Bakken

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology