One spacing unit covers this section. The Industrial Commission signed 7 orders on it between 2013 and 2026, and 3 of those changed something. Wells in the unit have reported 170,833 barrels of oil.
At a glance
1,280-acre unit · sections 25 and 36
The outline is the spacing unit that covers this section.
Spacing units over this section11,280 acres
Orders on record72013 to 2026; 3 changed something, 4 restated the rules
Most wells an order allows in the 1,280-acre unit8in 2013; the latest order read (2026) states 1
Horizontal wells with laterals in that unit11 active; started 2015
Oil those wells have reported170,833barrels, Jan 2003 to Aug 2026
Laterals that still fit3in this unit; a count of space, not a plan
What happened on this land
The 1,280-acre unit was set up in 2013, with 8 horizontal wells allowed. The latest order read, in 2026, states 1; a smaller number usually covers something narrower, not fewer wells for the unit. 1 horizontal well has laterals in it, started in 2015.
The 1,280-acre unit (sections 25 and 36). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2013
Jun 14, 2013Unit set up
Set up the 1,280-acre unit across sections 25 and 36, with up to 8 horizontal wells allowed.
Order 22101 · Case 19794
Aug 9, 2013Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 22839 · Case 20533 · Applicant: Hunt Oil Co.
2026
Jul 7, 2026Well count stated
States up to 1 horizontal well for the 1,280-acre unit; an earlier order stated up to 8.
Order 34740 · Case 31987 · Applicant: Murex Petroleum Corp.
4 more orders restated the rules without changing them
Aug 29, 2016: Order 27456 (case 25053)
Jul 7, 2026: Order 34880 (case 32103)
Jul 7, 2026: Order 35051 (case 32296), Murex Petroleum Corp.
Jul 7, 2026: Order 35379 (case 32540), Phoenix Operating LLC
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.