3 spacing units cover this section. The Industrial Commission signed 20 orders on them between 2010 and 2026, and 5 of those changed something. Wells in the smallest unit have reported 325,058 barrels of oil.
At a glance
1,280-acre unit · sections 28 and 33
2,560-acre unit · sections 21, 28 and 33
3,840-acre unit · sections 27, 28, 33 and 34
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section31,280, 2,560 and 3,840 acres
Orders on record202010 to 2026; 5 changed something, 15 restated the rules
Most wells an order allows in the 1,280-acre unit1stated in 2010
Horizontal wells with laterals in that unit22 active; started 2015 to 2024
Oil those wells have reported325,058barrels, Jan 2003 to Aug 2026
Laterals that still fit4in 1 of the units; a count of space, not a plan
What happened on this land
The 1,280-acre unit was set up in 2010, with 1 horizontal well allowed. 2 horizontal wells have laterals in it, started between 2015 and 2024.
The 1,280-acre unit (sections 28 and 33). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2010
Nov 30, 2010Unit set up
Set up the 1,280-acre unit across sections 28 and 33, with up to 1 horizontal well allowed.
Order 15246 · Case 12979 · Applicant: Petro-Hunt, L.L.C.
2015
Mar 5, 2015Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 26033 · Case 23692 · Applicant: SM Energy Co.
2024
Jan 17, 2024First on record
First order on record for the 3,840-acre unit across sections 27, 28, 33 and 34.
Order 33076 · Case 30463 · Applicant: Phoenix Operating LLC
Nov 1, 2024Pooled
Pooled the 3,840-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 33514 · Case 30860 · Applicant: Phoenix Operating, LLC
2026
Oct 5, 2026Unit set up
Set up the 2,560-acre unit across sections 21, 28 and 33, with up to 4 horizontal wells allowed.
Restated the rules for the 1,280-acre unit (1 well).
Order 35274 · Case 32494 · Applicant: Petro-Hunt, L.L.C.
15 more orders restated the rules without changing them
Nov 30, 2010: Order 15311 (case 13044)
Jul 30, 2021: Order 31312 (case 28764)
Jul 30, 2021: Order 31313 (case 28765)
Jul 30, 2021: Order 31314 (case 28766)
Jul 30, 2021: Order 31315 (case 28767)
Jul 30, 2021: Order 31316 (case 28768)
Jul 30, 2021: Order 31373 (case 28825)
Sep 17, 2021: Order 31401 (case 28855)
Sep 17, 2021: Order 31402 (case 28856)
Nov 8, 2022: Order 32234 (case 29649)
Apr 26, 2023: Order 32447 (case 29842)
Sep 6, 2023: Order 32738 (case 30132)
Jan 17, 2024: Order 33078 (case 30465), Phoenix Operating LLC
Oct 5, 2026: Order 35275 (case 32495)
Oct 5, 2026: Order 35278 (case 32498), Petro-Hunt, L.L.C.
The units that cover it
A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.