2 spacing units cover this section. The Industrial Commission signed 9 orders on them between 2005 and 2015, and 5 of those changed something. Wells in the smallest unit have reported 172,249 barrels of oil.

At a glance

T158N R95WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 30 and 31
  • 2,560-acre unit · sections 29, 30, 31 and 32
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section21,280 and 2,560 acres
Orders on record92005 to 2015; 5 changed something, 4 restated the rules
Most wells an order allows in the 1,280-acre unit10up from 1 in 2005
Horizontal wells with laterals in that unit11 active; started 2010
Oil those wells have reported172,249barrels, Jan 2003 to Aug 2026
Laterals that still fit5in 1 of the units; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2005, with 1 horizontal well allowed. Orders in 2011, 2014 and 2015 raised that to 10. 1 horizontal well has laterals in it, started in 2010.

48200520102015202020251 well10 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 30 and 31). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2005
  2. Sep 30, 2005Unit set up

    Set up the 1,280-acre unit across sections 30 and 31, with up to 1 horizontal well allowed.

    Order 10170 · Case 8667 · Applicant: Murex Petroleum Corporation

  3. 2011
  4. Aug 25, 2011More wells allowed

    Raised the 1,280-acre unit from 1 to 3 horizontal wells allowed.

    Order 16269 · Case 13996 · Applicant: Sequel Energy, LLC

  5. Sep 7, 2011Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 17352 · Case 15101 · Applicant: XTO Energy Inc.

  6. 2014
  7. May 22, 2014More wells allowed

    Raised the 1,280-acre unit from 3 to 8 horizontal wells allowed.

    Order 21429 · Case 19126 · Applicant: XTO Energy Inc.

  8. 2015
  9. Mar 5, 2015Unit set up

    Set up the 2,560-acre unit across sections 29, 30, 31 and 32, with up to 2 horizontal wells allowed.

    Raised the 1,280-acre unit from 8 to 10 horizontal wells allowed.

    Order 25773 · Case 23433 · Applicant: XTO Energy Inc.

4 more orders restated the rules without changing them
  • Feb 17, 2009: Order 12798 (case 10825), XTO Energy, Inc.
  • Aug 20, 2010: Order 14528 (case 12276), Murex Petroleum Corp.
  • Aug 25, 2011: Order 16380 (case 14105), XTO Energy Inc.
  • Mar 5, 2015: Order 25978 (case 23637), XTO Energy Inc.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 30 and 31

Set up
Sep 2005 · Order 10170
Most wells an order allows
10 · 2015
Last real change
Mar 2015
Wells with laterals inside
1
Oil reported
172,249 bbl
Laterals that still fit
5
Pool
Mcgregor-Bakken

2,560 acresSections 29, 30, 31 and 32

Set up
Mar 2015 · Order 25773
Most wells an order allows
2 · 2015
Last real change
Mar 2015
Wells with laterals inside
6
Pool
Mcgregor-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 30 and 31, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology