One spacing unit covers this section. The Industrial Commission signed 2 orders on it in 2018.
At a glance
1,920-acre unit · sections 30 and 31
The outline is the spacing unit that covers this section.
Spacing units over this section11,920 acres
Orders on record22018; 2 changed something, 0 restated the rules
Most wells an order allows in the 1,920-acre unit8stated in 2018
Horizontal wells with laterals in that unit20 active; started 2018
Laterals that still fit2in this unit; a count of space, not a plan
What happened on this land
The 1,920-acre unit was set up in 2018, with 8 horizontal wells allowed. 2 horizontal wells have laterals in it, started in 2018.
The 1,920-acre unit (sections 30 and 31). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2018
Apr 13, 2018Unit set up
Set up the 1,920-acre unit across sections 30 and 31, with up to 8 horizontal wells allowed.
Order 28895 · Case 26467 · Applicant: Liberty Resources Management Co., LLC
Apr 13, 2018Pooled
Pooled the 1,920-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 28910 · Case 26482 · Applicant: Liberty Resources Management Co. LLC
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.