One spacing unit covers this section. The Industrial Commission signed 3 orders on it between 2010 and 2026, and 2 of those changed something.
At a glance
1,280-acre unit · sections 15 and 16
The outline is the spacing unit that covers this section.
Spacing units over this section11,280 acres
Orders on record32010 to 2026; 2 changed something, 1 restated the rules
Most wells an order allows in the 1,280-acre unit1stated in 2010
Laterals that still fit5in this unit; a count of space, not a plan
What happened on this land
The 1,280-acre unit was set up in 2010, with 1 horizontal well allowed.
The 1,280-acre unit (sections 15 and 16). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2010
Jul 9, 2010Unit set up
Set up the 1,280-acre unit across sections 15 and 16, with up to 1 horizontal well allowed.
Order 14790 · Case 12533 · Applicant: EOG Resources, Inc.
2013
Feb 8, 2013Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 19587 · Case 17318 · Applicant: EOG Resources, Inc.
1 more order restated the rules without changing them
Jun 3, 2026: Order 35556 (case 32699), EOG Resources, Inc.
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.