3 spacing units cover this section. The Industrial Commission signed 10 orders on them between 2011 and 2026, and 7 of those changed something. Wells in the smallest unit have reported 2.0 million barrels of oil.
At a glance
1,280-acre unit · sections 26 and 35
2,560-acre unit · sections 25, 26, 35 and 36
2,560-acre unit · sections 26, 27, 34 and 35
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section31,280 and 2,560 acres
Orders on record102011 to 2026; 7 changed something, 3 restated the rules
Most wells an order allows in the 1,280-acre unit8up from 2 in 2011
Horizontal wells with laterals in that unit108 active; started 2010 to 2019
Oil those wells have reported2,043,758barrels, Jan 2003 to Aug 2026
What happened on this land
The 1,280-acre unit was set up in 2011, with 2 horizontal wells allowed. Orders in 2016 and 2017 raised that to 8. 10 horizontal wells have laterals in it, started between 2010 and 2019.
The 1,280-acre unit (sections 26 and 35). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2011
Aug 25, 2011Unit set up
Set up the 1,280-acre unit across sections 26 and 35, with up to 2 horizontal wells allowed.
Order 15665 · Case 13389
2014
May 5, 2014Unit set up
Set up the 2,560-acre unit over sections 25, 26, 35 and 36, with up to 1 horizontal well allowed.
Order 23598 · Case 21294 · Applicant: HRC Operating, LLC
2016
Jan 21, 2016More wells allowed
Raised the 1,280-acre unit from 2 to 6 horizontal wells allowed.
Order 24980 · Case 22645
2017
Apr 6, 2017Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 28107 · Case 25697 · Applicant: Crescent Point Energy U.S. Corp.
May 11, 2017Unit set up
Set up the 2,560-acre unit over sections 26, 27, 34 and 35.
Raised the 1,280-acre unit from 6 to 8 horizontal wells allowed.
Order 28091 · Case 25681 · Applicant: Crescent Point Energy US Corp.
2021
Feb 23, 2021Pooled
Pooled the 2,560-acre unit over sections 26, 27, 34 and 35: the owners' interests across it are combined, and all share in its wells.
Order 31236 · Case 28691 · Applicant: Crescent Point Energy U.S. Corp.
2026
Aug 17, 2026Well count set
Allowed up to 1 lease-line well in the 2,560-acre unit over sections 26, 27, 34 and 35, running north–south.
Restated the rules for the 1,280-acre unit (8 wells).
Restated the rules for the 2,560-acre unit over sections 25, 26, 35 and 36.
Order 35238 · Case 32458 · Applicant: Enerplus Resources (USA) Corp.
3 more orders restated the rules without changing them
Feb 10, 2012: Order 17612 (case 15366)
Sep 7, 2012: Order 20137 (case 17868)
May 11, 2017: Order 28108 (case 25698), Crescent Point Energy US Corp.
The units that cover it
A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.