Land · Mountrail County · T156N R93W

Section 34Township 156 North, Range 93 West

3 spacing units cover this section. The Industrial Commission signed 13 orders on them between 2008 and 2026, and 6 of those changed something.

At a glance

T156N R93WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · section 34
  • 2,560-acre unit · sections 33 and 34
  • 2,560-acre unit · sections 34 and 35
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section31,280 and 2,560 acres
Orders on record132008 to 2026; 6 changed something, 7 restated the rules
Most wells an order allows in the 1,280-acre unit8up from 4 in 2011
Horizontal wells with laterals in that unit1010 active; started 2011 to 2023
Laterals that still fit1in 1 of the units; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2008. An order in 2011 allowed up to 4 horizontal wells. An order in 2011 raised that to 8. 10 horizontal wells have laterals in it, started between 2011 and 2023.

24682015202020254 wells8 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (section 34). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2008
  2. Nov 5, 2008Unit set up

    Set up the 1,280-acre unit across section 34.

    Order 12534 · Case 10596 · Applicant: Brigham Oil And Gas, LP

  3. 2011
  4. Mar 22, 2011Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 16412 · Case 14137 · Applicant: Brigham Oil & Gas, L.P.

  5. Aug 16, 2011Well count set

    Allowed up to 4 horizontal wells in the 1,280-acre unit.

    Order 16284 · Case 14009 · Applicant: Brigham Oil & Gas, L.P.

  6. Dec 7, 2011More wells allowed

    Raised the 1,280-acre unit from 4 to 8 horizontal wells allowed.

    Order 17856 · Case 15610 · Applicant: Slawson Exploration Co., Inc.

  7. 2014
  8. Oct 24, 2014First on record

    First order on record for the 2,560-acre unit over sections 33 and 34.

    First order on record for the 2,560-acre unit over sections 34 and 35, with up to 2 horizontal wells allowed.

    Order 23546 · Case 21242 · Applicant: Oasis Petroleum North America LLC

  9. Dec 24, 2014Pooled

    Pooled the 2,560-acre unit over sections 33 and 34: the owners' interests across it are combined, and all share in its wells.

    Order 25040 · Case 22705 · Applicant: Statoil Oil & Gas LP

7 more orders restated the rules without changing them
  • Nov 25, 2008: Order 12492 (case 10560), Oasis Petroleum North America LLC
  • Jan 7, 2011: Order 16139 (case 13855), Brigham Oil & Gas, L.P.
  • Aug 16, 2011: Order 17383 (case 15135), Brigham Oil & Gas, L.P.
  • Dec 7, 2011: Order 18076 (case 15821), Brigham Oil & Gas, L.P.
  • Oct 24, 2014: Order 24616 (case 22283), Oasis Petroleum North America LLC
  • Oct 24, 2014: Order 24682 (case 22347), Statoil Oil And Gas LP
  • Aug 21, 2026: Order 35988 (case 33038), SOGC, LLC

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSection 34

Set up
Nov 2008 · Order 12534
Most wells an order allows
8 · 2011
Last real change
Dec 2011
Wells with laterals inside
10
Pool
Alger-Bakken

2,560 acresSections 33 and 34

First order on record
Oct 2014 · Order 23546
Last real change
Dec 2014
Wells with laterals inside
15
Pool
Alger-Bakken

2,560 acresSections 34 and 35

First order on record
Oct 2014 · Order 23546
Most wells an order allows
2 · 2014
Last real change
Oct 2014
Wells with laterals inside
19
Laterals that still fit
1
Pool
Alger-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside section 34, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology