Land · Williams County · T155N R96W

Section 4Township 155 North, Range 96 West

3 spacing units cover this section. The Industrial Commission signed 11 orders on them between 2008 and 2025, and 7 of those changed something. Wells in the smallest unit have reported 660,637 barrels of oil.

At a glance

T155N R96WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 4 and 9
  • 2,560-acre unit · sections 3, 4, 9 and 10
  • 2,560-acre unit · sections 4, 5, 8 and 9
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section31,280 and 2,560 acres
Orders on record112008 to 2025; 7 changed something, 4 restated the rules
Most wells an order allows in the 1,280-acre unit8up from 3 in 2011
Horizontal wells with laterals in that unit44 active; started 2010 to 2021
Oil those wells have reported660,637barrels, Jan 2003 to Aug 2026
Laterals that still fit6in 1 of the units; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2008. An order in 2011 allowed up to 3 horizontal wells. An order in 2013 raised that to 8. 4 horizontal wells have laterals in it, started between 2010 and 2021.

246820102015202020253 wells8 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 4 and 9). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2008
  2. Mar 25, 2008Unit set up

    Set up the 1,280-acre unit across sections 4 and 9.

    Order 11684 · Case 9920 · Applicant: Hess Corp.

  3. 2011
  4. Jan 20, 2011Well count set

    Allowed up to 3 horizontal wells in the 1,280-acre unit.

    Order 15060 · Case 12797 · Applicant: XTO Energy Inc.

  5. Nov 15, 2011Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 17784 · Case 15538 · Applicant: XTO Energy Inc.

  6. 2013
  7. Apr 3, 2013More wells allowed

    Raised the 1,280-acre unit from 3 to 8 horizontal wells allowed.

    Order 20611 · Case 18342 · Applicant: XTO Energy Inc.

  8. 2015
  9. Apr 7, 2015Unit set up

    Set up the 2,560-acre unit over sections 4, 5, 8 and 9.

    Order 23585 · Case 21281 · Applicant: XTO Energy Inc.

  10. Aug 18, 2015Unit set up

    Set up the 2,560-acre unit over sections 3, 4, 9 and 10.

    Order 26424 · Case 24081 · Applicant: Hess Bakken Investments II, LLC

  11. 2019
  12. Nov 5, 2019Pooled

    Pooled the 2,560-acre unit over sections 3, 4, 9 and 10: the owners' interests across it are combined, and all share in its wells.

    Order 30479 · Case 28026 · Applicant: Hess Bakken Investments II, LLC,

4 more orders restated the rules without changing them
  • Apr 24, 2008: Order 11791 (case 9999), Headington Oil Co. LLC
  • Feb 16, 2010: Order 14002 (case 11826), Murex Petroleum Corp.
  • Nov 30, 2015: Order 23693 (case 21380), Continental Resources, Inc.
  • Nov 5, 2025: Order 34618 (case 31876), Continental Resources, Inc.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 4 and 9

Set up
Mar 2008 · Order 11684
Most wells an order allows
8 · 2013
Last real change
Apr 2013
Wells with laterals inside
4
Oil reported
660,637 bbl
Laterals that still fit
6
Pool
Beaver Lodge-Bakken

2,560 acresSections 3, 4, 9 and 10

Set up
Aug 2015 · Order 26424
Last real change
Nov 2019
Wells with laterals inside
12
Oil reported
1,702,680 bbl
Pool
Beaver Lodge-Bakken

2,560 acresSections 4, 5, 8 and 9

Set up
Apr 2015 · Order 23585
Last real change
Apr 2015
Wells with laterals inside
9
Pool
Beaver Lodge-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 4 and 9, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology