Land · Mountrail County · T155N R90W

Section 25Township 155 North, Range 90 West

3 spacing units cover this section. The Industrial Commission signed 8 orders on them between 2010 and 2026, and 6 of those changed something. Wells in the smallest unit have reported 700,323 barrels of oil.

At a glance

T155N R90WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 640-acre unit · section 25
  • 1,280-acre unit · sections 25 and 26
  • 2,560-acre unit · sections 25 and 36
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section3640, 1,280 and 2,560 acres
Orders on record82010 to 2026; 6 changed something, 2 restated the rules
Most wells an order allows in the 640-acre unit3in 2010; the latest order read (2025) states 2
Horizontal wells with laterals in that unit55 active; started 2008 to 2025
Oil those wells have reported700,323barrels, Jan 2003 to Aug 2026
Laterals that still fit3in 1 of the units; a count of space, not a plan

What happened on this land

The 640-acre unit was set up in 2010, with 3 horizontal wells allowed. The latest order read, in 2025, states 2; a smaller number usually covers something narrower, not fewer wells for the unit. 5 horizontal wells have laterals in it, started between 2008 and 2025.

12320102015202020253 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 640-acre unit (section 25). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2010
  2. Feb 3, 2010Unit set up

    Set up the 640-acre unit across section 25, with up to 3 horizontal wells allowed.

    Order 14127 · Case 11939 · Applicant: EOG Resources, Inc.

  3. 2012
  4. Oct 9, 2012Pooled

    Pooled the 640-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 21048 · Case 18746 · Applicant: EOG Resources, Inc.

  5. 2014
  6. Dec 24, 2014Unit set up

    Set up the 1,280-acre unit across sections 25 and 26, with up to 1 horizontal well allowed.

    Order 23815 · Case 21473 · Applicant: Sinclair Oil & Gas Co.

  7. 2015
  8. Aug 3, 2015Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 26606 · Case 24241 · Applicant: Sinclair Oil & Gas Co.

  9. 2025
  10. Apr 21, 2025Unit set up

    Set up the 2,560-acre unit across sections 25 and 36, with up to 2 horizontal wells allowed.

    States up to 2 horizontal wells for the 640-acre unit; an earlier order stated up to 3.

    Order 33735 · Case 31049 · Applicant: Hunt Oil Co.

  11. 2026
  12. Jan 7, 2026Pooled

    Pooled the 2,560-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 34779 · Case 32026 · Applicant: Hunt Oil Co.

2 more orders restated the rules without changing them
  • Apr 21, 2025: Order 34203 (case 31482), Slawson Exploration Company, Inc.
  • Jun 29, 2026: Order 35934 (case 32779), EOG Resources, Inc.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

640 acresSection 25

Set up
Feb 2010 · Order 14127
Most wells an order allows
3 · 2010
Latest count read
2 · 2025
Last real change
Apr 2025
Wells with laterals inside
5
Oil reported
700,323 bbl
Pool
Parshall-Bakken

1,280 acresSections 25 and 26

Set up
Dec 2014 · Order 23815
Most wells an order allows
1 · 2014
Last real change
Aug 2015
Wells with laterals inside
7
Oil reported
1,236,890 bbl
Laterals that still fit
3
Pool
Parshall-Bakken

2,560 acresSections 25 and 36

Set up
Apr 2025 · Order 33735
Most wells an order allows
2 · 2025
Last real change
Jan 2026
Wells with laterals inside
9
Oil reported
1,143,935 bbl
Pool
Parshall-Bakken

Wells in the 640-acre unit

Horizontal wells with at least 660 ft of lateral inside section 25, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology