Land · Mountrail County · T154N R93W

Section 24Township 154 North, Range 93 West

3 spacing units cover this section. The Industrial Commission signed 9 orders on them between 2012 and 2023, and 7 of those changed something. Wells in the smallest unit have reported 1.2 million barrels of oil.

At a glance

T154N R93WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 640-acre unit · section 24
  • 1,280-acre unit · sections 13 and 24
  • 3,840-acre unit · sections 24, 25 and 36
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section3640, 1,280 and 3,840 acres
Orders on record92012 to 2023; 7 changed something, 2 restated the rules
Most wells an order allows in the 640-acre unit6in 2012; the latest order read (2021) states 3
Horizontal wells with laterals in that unit97 active; started 2010 to 2024
Oil those wells have reported1,156,983barrels, Jan 2003 to Aug 2026
Laterals that still fit2in 1 of the units; a count of space, not a plan

What happened on this land

The 640-acre unit was set up in 2012, with 6 horizontal wells allowed. The latest order read, in 2021, states 3; a smaller number usually covers something narrower, not fewer wells for the unit. 9 horizontal wells have laterals in it, started between 2010 and 2024.

24620102015202020256 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 640-acre unit (section 24). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2012
  2. Mar 22, 2012Pooled

    Pooled the 640-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 17238 · Case 14987 · Applicant: Hess Corp.

  3. Mar 22, 2012Unit set up

    Set up the 640-acre unit across section 24, with up to 6 horizontal wells allowed.

    Order 18150 · Case 15891 · Applicant: Hess Corp.

  4. 2021
  5. Jan 14, 2021Well count stated

    States up to 3 horizontal wells for the 640-acre unit; an earlier order stated up to 6.

    Order 31166 · Case 28624 · Applicant: Hess Bakken Investments II, LLC

  6. Apr 28, 2021Unit set up

    Set up the 3,840-acre unit across sections 24, 25 and 36.

    Order 31268 · Case 28723 · Applicant: Kraken Oil & Gas, LLC

  7. Jul 27, 2021Unit set up

    Set up the 1,280-acre unit across sections 13 and 24, with up to 6 horizontal wells allowed.

    Restated the rules for the 3,840-acre unit.

    Order 31375 · Case 28827 · Applicant: Hess Corp.

  8. Jul 27, 2021Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 31376 · Case 28828 · Applicant: Hess Corp.

  9. Oct 19, 2021Well count set

    Allowed up to 2 horizontal wells in the 3,840-acre unit.

    Restated the rules for the 1,280-acre unit (6 wells).

    Order 31462 · Case 28914

2 more orders restated the rules without changing them
  • Jan 17, 2023: Order 32236 (case 29651)
  • Mar 8, 2023: Order 32321 (case 29714)

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

640 acresSection 24

Set up
Mar 2012 · Order 18150
Most wells an order allows
6 · 2012
Latest count read
3 · 2021
Last real change
Jan 2021
Wells with laterals inside
9
Oil reported
1,156,983 bbl
Pool
Robinson Lake-Bakken

1,280 acresSections 13 and 24

Set up
Jul 2021 · Order 31375
Most wells an order allows
6 · 2021
Last real change
Jul 2021
Wells with laterals inside
12
Oil reported
1,883,109 bbl
Pool
Robinson Lake-Bakken

3,840 acresSections 24, 25 and 36

Set up
Apr 2021 · Order 31268
Most wells an order allows
2 · 2021
Last real change
Oct 2021
Wells with laterals inside
41
Laterals that still fit
2
Pool
Robinson Lake-Bakken

Wells in the 640-acre unit

Horizontal wells with at least 660 ft of lateral inside section 24, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology