2 spacing units cover this section. The Industrial Commission signed 15 orders on them between 2010 and 2026, and 6 of those changed something. Wells in the smallest unit have reported 1.2 million barrels of oil.

At a glance

T152N R101WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 6 and 7
  • 2,560-acre unit · sections 5, 6, 7 and 8
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section21,280 and 2,560 acres
Orders on record152010 to 2026; 6 changed something, 9 restated the rules
Most wells an order allows in the 1,280-acre unit12up from 1 in 2010
Horizontal wells with laterals in that unit76 active; started 1983 to 2014
Oil those wells have reported1,242,330barrels, Jan 2003 to Aug 2026
Laterals that still fit3in these units; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2010, with 1 horizontal well allowed. Orders in 2013 and 2015 raised that to 12. 7 horizontal wells have laterals in it, started between 1983 and 2014.

481219902000201020201 well12 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 6 and 7). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2010
  2. Jul 26, 2010Unit set up

    Set up the 1,280-acre unit across sections 6 and 7, with up to 1 horizontal well allowed.

    Order 14800 · Case 12543 · Applicant: Zenergy, Inc.

  3. 2013
  4. Feb 7, 2013More wells allowed

    Raised the 1,280-acre unit from 1 to 7 horizontal wells allowed.

    Order 18255 · Case 15992 · Applicant: Denbury Onshore, LLC

  5. 2014
  6. Jul 18, 2014Unit set up

    Set up the 2,560-acre unit across sections 5, 6, 7 and 8, with up to 1 horizontal well allowed.

    Order 24875 · Case 22541 · Applicant: XTO Energy Inc.

  7. 2015
  8. May 28, 2015Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 26285 · Case 23942 · Applicant: XTO Energy Inc.

  9. Sep 3, 2015More wells allowed

    Raised the 1,280-acre unit from 7 to 12 horizontal wells allowed.

    Order 25331 · Case 22998

  10. Oct 2, 2015Pooled

    Pooled the 2,560-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 26864 · Case 24498 · Applicant: XTO Energy Inc.

9 more orders restated the rules without changing them
  • Oct 19, 2011: Order 17301 (case 15050), Denbury Onshore, LLC
  • Oct 19, 2011: Order 17746 (case 15500)
  • Jun 1, 2012: Order 19058 (case 16789), XTO Energy Inc.
  • Jan 20, 2015: Order 25454 (case 23125), SM Energy Co.
  • Sep 3, 2015: Order 23686 (case 21379), Continental Resources, Inc.
  • Sep 3, 2015: Order 26145 (case 23804), XTO Energy Inc.
  • Apr 25, 2023: Order 32506 (case 29901)
  • Mar 30, 2026: Order 34967 (case 32212)
  • May 5, 2026: Order 35508 (case 32651), Devon Energy Williston, L.L.C.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 6 and 7

Set up
Jul 2010 · Order 14800
Most wells an order allows
12 · 2015
Last real change
Sep 2015
Wells with laterals inside
7
Oil reported
1,242,330 bbl
Laterals that still fit
2
Pool
Indian Hill-Bakken

2,560 acresSections 5, 6, 7 and 8

Set up
Jul 2014 · Order 24875
Most wells an order allows
1 · 2014
Last real change
Oct 2015
Wells with laterals inside
17
Oil reported
3,192,678 bbl
Laterals that still fit
1
Pool
Camp-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 6 and 7, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology