Land · McKenzie County · T151N R101W

Section 9Township 151 North, Range 101 West

3 spacing units cover this section. The Industrial Commission signed 8 orders on them between 2011 and 2024, and 7 of those changed something. Wells in the smallest unit have reported 930,945 barrels of oil.

At a glance

T151N R101WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 4 and 9
  • 2,560-acre unit · sections 3, 4, 9 and 10
  • 2,560-acre unit · sections 4, 5, 8 and 9
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section31,280 and 2,560 acres
Orders on record82011 to 2024; 7 changed something, 1 restated the rules
Most wells an order allows in the 1,280-acre unit8up from 4 in 2011
Horizontal wells with laterals in that unit66 active; started 2011 to 2024
Oil those wells have reported930,945barrels, Jan 2003 to Aug 2026
Laterals that still fit2in 1 of the units; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2011, with 4 horizontal wells allowed. An order in 2013 raised that to 8. 6 horizontal wells have laterals in it, started between 2011 and 2024.

24682015202020254 wells8 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 4 and 9). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2011
  2. Jun 13, 2011Unit set up

    Set up the 1,280-acre unit across sections 4 and 9, with up to 4 horizontal wells allowed.

    Order 16343 · Case 14068 · Applicant: Brigham Oil & Gas, L.P.

  3. 2012
  4. Feb 9, 2012Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 17837 · Case 15591 · Applicant: Brigham Oil & Gas, L.P.

  5. 2013
  6. May 10, 2013More wells allowed

    Raised the 1,280-acre unit from 4 to 8 horizontal wells allowed.

    Order 19522 · Case 17253 · Applicant: Brigham Oil & Gas, LP

  7. 2015
  8. Dec 16, 2015Unit set up

    Set up the 2,560-acre unit over sections 4, 5, 8 and 9.

    Order 25490 · Case 23159 · Applicant: Statoil Oil And Gas LP

  9. Dec 30, 2015Pooled

    Pooled the 2,560-acre unit over sections 4, 5, 8 and 9: the owners' interests across it are combined, and all share in its wells.

    Order 25835 · Case 23495 · Applicant: Statoil Oil & Gas LP

  10. 2024
  11. Sep 16, 2024Unit set up

    Set up the 2,560-acre unit over sections 3, 4, 9 and 10.

    Restated the rules for the 2,560-acre unit over sections 4, 5, 8 and 9.

    Order 33659 · Case 30987 · Applicant: Grayson Mill Operating, LLC

  12. Sep 16, 2024Pooled

    Pooled the 2,560-acre unit over sections 3, 4, 9 and 10: the owners' interests across it are combined, and all share in its wells.

    Order 33665 · Case 30993 · Applicant: Grayson Mill Operating, LLC

1 more order restated the rules without changing them
  • Dec 16, 2015: Order 25690 (case 23347), Triangle USA Petroleum Corp.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 4 and 9

Set up
Jun 2011 · Order 16343
Most wells an order allows
8 · 2013
Last real change
May 2013
Wells with laterals inside
6
Oil reported
930,945 bbl
Laterals that still fit
2
Pool
Ragged Butte-Bakken

2,560 acresSections 3, 4, 9 and 10

Set up
Sep 2024 · Order 33659
Last real change
Sep 2024
Wells with laterals inside
11
Oil reported
2,195,682 bbl
Pool
Ragged Butte-Bakken

2,560 acresSections 4, 5, 8 and 9

Set up
Dec 2015 · Order 25490
Last real change
Dec 2015
Wells with laterals inside
13
Oil reported
2,390,697 bbl
Pool
Ragged Butte-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 4 and 9, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology