Land · McKenzie County · T150N R97W

Section 20Township 150 North, Range 97 West

4 spacing units cover this section. The Industrial Commission signed 10 orders on them between 2005 and 2025, and 8 of those changed something.

At a glance

T150N R97WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 640-acre unit · section 20
  • 1,280-acre unit · sections 17 and 20
  • 2,560-acre unit · sections 16, 17, 20 and 21
  • 2,560-acre unit · sections 17, 18, 19 and 20
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section4640, 1,280 and 2,560 acres
Orders on record102005 to 2025; 8 changed something, 2 restated the rules
Horizontal wells with laterals in that unit98 active; started 2005 to 2016
Laterals that still fit1in 1 of the units; a count of space, not a plan

What happened on this land

The 640-acre unit was set up in 2005. 9 horizontal wells have laterals in it, started between 2005 and 2016.

  1. 2005
  2. Aug 12, 2005Unit set up

    Set up the 640-acre unit across section 20.

    Order 10136 · Case 8635 · Applicant: Lyco Energy Corporation

  3. 2011
  4. Jan 19, 2011First on record

    First order on record for the 1,280-acre unit across sections 17 and 20.

    Order 15520 · Case 13247 · Applicant: Continental Resources, Inc.

  5. 2013
  6. Oct 4, 2013Well count set

    Allowed up to 10 horizontal wells in the 1,280-acre unit.

    Order 21900 · Case 19594 · Applicant: SM Energy Co.

  7. 2014
  8. Feb 12, 2014Unit set up

    Set up the 2,560-acre unit over sections 16, 17, 20 and 21, with up to 1 horizontal well allowed.

    Set up the 2,560-acre unit over sections 17, 18, 19 and 20, with up to 1 horizontal well allowed.

    Order 23464 · Case 21160 · Applicant: XTO Energy Inc.

  9. Dec 4, 2014Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 25630 · Case 23287 · Applicant: XTO Energy Inc.

  10. 2016
  11. Apr 15, 2016Pooled

    Pooled the 2,560-acre unit over sections 16, 17, 20 and 21: the owners' interests across it are combined, and all share in its wells.

    Order 27329 · Case 24938 · Applicant: XTO Energy Inc.

  12. Apr 15, 2016Pooled

    Pooled the 2,560-acre unit over sections 17, 18, 19 and 20: the owners' interests across it are combined, and all share in its wells.

    Order 27330 · Case 24939 · Applicant: XTO Energy Inc.

  13. 2020
  14. Jun 3, 2020More wells allowed

    Raised the 2,560-acre unit over sections 16, 17, 20 and 21 from 1 to 2 horizontal wells allowed.

    Raised the 2,560-acre unit over sections 17, 18, 19 and 20 from 1 to 2 horizontal wells allowed.

    Order 30851 · Case 28393 · Applicant: Ovintiv Production Inc.

2 more orders restated the rules without changing them
  • Oct 4, 2013: Order 22967 (case 20662), XTO Energy Inc.
  • Oct 17, 2025: Order 34449 (case 31713), Devon Energy Williston, LLC

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

640 acresSection 20

Set up
Aug 2005 · Order 10136
Last real change
Aug 2005
Wells with laterals inside
9
Pool
Siverston-Bakken

1,280 acresSections 17 and 20

First order on record
Jan 2011 · Order 15520
Most wells an order allows
10 · 2013
Last real change
Dec 2014
Wells with laterals inside
12
Oil reported
3,091,835 bbl
Laterals that still fit
1
Pool
Siverston-Bakken

2,560 acresSections 16, 17, 20 and 21

Set up
Feb 2014 · Order 23464
Most wells an order allows
2 · 2020
Last real change
Jun 2020
Wells with laterals inside
24
Oil reported
6,144,641 bbl
Pool
Siverston-Bakken

2,560 acresSections 17, 18, 19 and 20

Set up
Feb 2014 · Order 23464
Most wells an order allows
2 · 2020
Last real change
Jun 2020
Wells with laterals inside
22
Oil reported
6,203,288 bbl
Pool
Siverston-Bakken

Wells in the 640-acre unit

Horizontal wells with at least 660 ft of lateral inside section 20, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology