One spacing unit covers this section. The Industrial Commission signed 11 orders on it between 2010 and 2017, and 6 of those changed something.
At a glance
320-acre unit · part of section 4
The outline is the spacing unit that covers this section.
Spacing units over this section1320 acres
Orders on record112010 to 2017; 6 changed something, 5 restated the rules
Most wells an order allows in the 320-acre unit6up from 1 in 2010
Horizontal wells with laterals in that unit66 active; started 2010 to 2017
What happened on this land
The 320-acre unit was set up in 2010, with 1 horizontal well allowed. Orders in 2011 and 2013 raised that to 6. 6 horizontal wells have laterals in it, started between 2010 and 2017.
The 320-acre unit (part of section 4). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2010
Jul 26, 2010Unit set up
Set up the 320-acre unit across part of section 4, with up to 1 horizontal well allowed.
Order 14673 · Case 12417 · Applicant: EOG Resources, Inc.
2011
Mar 14, 2011More wells allowed
Raised the 320-acre unit from 1 to 2 horizontal wells allowed.
Order 15388 · Case 13120 · Applicant: Zenergy, Inc.
2013
Aug 12, 2013More wells allowed
Raised the 320-acre unit from 2 to 6 horizontal wells allowed.
Order 21222 · Case 18921 · Applicant: EOG Resources, Inc.
2014
Apr 22, 2014Well count stated
States up to 4 horizontal wells for the 320-acre unit; an earlier order stated up to 6.
Order 23842 · Case 21500 · Applicant: WPX Energy Williston, LLC
Dec 11, 2014Well count stated
States up to 2 horizontal wells for the 320-acre unit; an earlier order stated up to 6.
Order 24673 · Case 22338 · Applicant: EOG Resources, Inc.
2016
May 31, 2016Pooled
Pooled the 320-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 27461 · Case 25058 · Applicant: XTO Energy Inc.
5 more orders restated the rules without changing them
Mar 14, 2011: Order 15554 (case 13277), EOG Resources, Inc.
Aug 12, 2013: Order 22269 (case 19962), EOG Resources, Inc.
Mar 3, 2016: Order 26351 (case 24008), WPX Energy Williston, LLC
Oct 13, 2016: Order 26167 (case 23826), XTO Energy Inc.
Aug 15, 2017: Order 28088 (case 25678), WPX Energy Williston, LLC
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.