One spacing unit covers this section. The Industrial Commission signed 7 orders on it between 2016 and 2023, and 3 of those changed something.
At a glance
1,280-acre unit · part of sections 5, 6, 7 and 8
The outline is the spacing unit that covers this section.
Spacing units over this section11,280 acres
Orders on record72016 to 2023; 3 changed something, 4 restated the rules
Most wells an order allows in the 1,280-acre unit4up from 3 in 2016
Horizontal wells with laterals in that unit1716 active; started 2009 to 2020
What happened on this land
The 1,280-acre unit was set up in 2016, with 3 horizontal wells allowed. An order in 2023 raised that to 4. 17 horizontal wells have laterals in it, started between 2009 and 2020.
The 1,280-acre unit (part of sections 5, 6, 7 and 8). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2016
Jan 15, 2016Unit set up
Set up the 1,280-acre unit across part of sections 5, 6, 7 and 8, with up to 3 horizontal wells allowed.
Order 26745 · Case 24378 · Applicant: QEP Energy Co.
2019
Mar 5, 2019Pooled
Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 29781 · Case 27335 · Applicant: Rimrock Oil & Gas Williston LLC
2023
Feb 2, 2023More wells allowed
Raised the 1,280-acre unit from 3 to 4 horizontal wells allowed.
Order 32107 · Case 29537 · Applicant: WPX Energy Williston, LLC
4 more orders restated the rules without changing them
Feb 2, 2023: Order 32110 (case 29540), WPX Energy Williston, LLC
Feb 2, 2023: Order 32361 (case 29754), WPX Energy Williston, LLC
Feb 13, 2023: Order 32344 (case 29737), Enerplus Resources (USA) Corporation
Feb 13, 2023: Order 32352 (case 29745), WPX Energy Williston, LLC
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.