Land · McKenzie County · T148N R98W

Section 11Township 148 North, Range 98 West

2 spacing units cover this section. The Industrial Commission signed 10 orders on them between 2009 and 2022, and 8 of those changed something. Wells in the smallest unit have reported 912,145 barrels of oil. Orders ended them.

At a glance

T148N R98WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 2 and 11
  • 2,560-acre unit · sections 1, 2, 11 and 12
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section21,280 and 2,560 acres
Orders on record102009 to 2022; 8 changed something, 2 restated the rules
Most wells an order allows in the 1,280-acre unit3up from 1 in 2009
Horizontal wells with laterals in that unit50 active; started 2011 to 2026
Oil those wells have reported912,145barrels, Jan 2003 to Jun 2026
Laterals that still fit5in 1 of the units; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2009, with 1 horizontal well allowed. Orders in 2009 and 2013 raised that to 3. 5 horizontal wells have laterals in it, started between 2011 and 2026.

12320102015202020251 well3 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 2 and 11). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2009
  2. Sep 25, 2009Unit set up

    Set up the 1,280-acre unit across sections 2 and 11.

    Order 13505 · Case 11260 · Applicant: Burlington Resources Oil & Gas Co. LP

  3. Sep 25, 2009Well count set

    Allowed up to 1 horizontal well in the 1,280-acre unit.

    Order 13569 · Case 11448 · Applicant: XTO Energy Inc.

  4. Dec 23, 2009More wells allowed

    Raised the 1,280-acre unit from 1 to 2 horizontal wells allowed.

    Order 13898 · Case 11543

  5. 2011
  6. Jan 5, 2011Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 16070 · Case 13788 · Applicant: Burlington Resources Oil & Gas Co. LP

  7. 2013
  8. Jun 6, 2013First on record

    First order on record for the 2,560-acre unit across sections 1, 2, 11 and 12.

    Raised the 1,280-acre unit from 2 to 3 horizontal wells allowed.

    Order 20427 · Case 18158 · Applicant: XTO Energy Inc.

  9. Jun 6, 2013Well count set

    Allowed up to 1 horizontal well in the 2,560-acre unit.

    Restated the rules for the 1,280-acre unit (3 wells).

    Order 20681 · Case 18396 · Applicant: Burlington Resources Oil & Gas Co. LP

  10. 2014
  11. Jun 20, 2014Pooled

    Pooled the 2,560-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 24301 · Case 21968 · Applicant: Burlington Resources Oil & Gas Co. LP,

  12. 2022
  13. Jun 30, 2022Unit ended

    Ended the 1,280-acre unit.

    Ended the 2,560-acre unit.

    Order 31792 · Case 29224

2 more orders restated the rules without changing them
  • Jun 2, 2010: Order 14434 (case 12181)
  • Aug 29, 2019: Order 30074 (case 27630), Continental Resources, Inc.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 2 and 11

An order ended this unit.

Set up
Sep 2009 · Order 13505
Most wells an order allows
3 · 2013
Last real change
Jun 2022
Wells with laterals inside
5
Oil reported
912,145 bbl
Laterals that still fit
5
Pool
Haystack Butte-Bakken

2,560 acresSections 1, 2, 11 and 12

An order ended this unit.

First order on record
Jun 2013 · Order 20427
Most wells an order allows
1 · 2013
Last real change
Jun 2022
Wells with laterals inside
14
Oil reported
1,945,819 bbl
Pool
Haystack Butte-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 2 and 11, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology