Land · Dunn County · T148N R95W

Section 21Township 148 North, Range 95 West

2 spacing units cover this section. The Industrial Commission signed 6 orders on them between 2014 and 2026, and 2 of those changed something.

At a glance

T148N R95WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,920-acre unit · sections 19, 20 and 21
  • 2,560-acre unit · sections 15, 16, 21 and 22
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section21,920 and 2,560 acres
Orders on record62014 to 2026; 2 changed something, 4 restated the rules
Most wells an order allows in the 1,920-acre unit1stated in 2020
Laterals that still fit12in these units; a count of space, not a plan

What happened on this land

The 1,920-acre unit was set up in 2020, with 1 horizontal well allowed.

120202022202420261 wellMost horizontal wells an order has allowed
The 1,920-acre unit (sections 19, 20 and 21). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2014
  2. Mar 21, 2014First on record

    First order on record for the 2,560-acre unit across sections 15, 16, 21 and 22, with up to 3 horizontal wells allowed.

    Order 23240 · Case 20934 · Applicant: Enerplus Resources (USA) Inc.

  3. 2020
  4. Mar 2, 2020Unit set up

    Set up the 1,920-acre unit across sections 19, 20 and 21, with up to 1 horizontal well allowed.

    Order 28993 · Case 26560 · Applicant: Petroshale (US), Inc.

4 more orders restated the rules without changing them
  • Mar 21, 2014: Order 23536 (case 21232), HRC Operating, LLC
  • Oct 1, 2021: Order 31409 (case 28863)
  • Jul 29, 2022: Order 31929 (case 29359)
  • Jul 17, 2026: Order 35872 (case 32943), XTO Energy Inc.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,920 acresSections 19, 20 and 21

Set up
Mar 2020 · Order 28993
Most wells an order allows
1 · 2020
Last real change
Mar 2020
Wells with laterals inside
0
Laterals that still fit
11
Pool
Lost Bridge-Bakken

2,560 acresSections 15, 16, 21 and 22

First order on record
Mar 2014 · Order 23240
Most wells an order allows
3 · 2014
Last real change
Mar 2014
Wells with laterals inside
13
Laterals that still fit
1
Pool
Eagle Nest-Bakken

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology