Land · Dunn County · T148N R94W

Section 23Township 148 North, Range 94 West

3 spacing units cover this section. The Industrial Commission signed 10 orders on them between 2011 and 2025, and 8 of those changed something.

At a glance

T148N R94WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 640-acre unit · section 23
  • 2,560-acre unit · sections 14, 15, 22 and 23
  • 2,560-acre unit · sections 22, 23, 26 and 27
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section3640 and 2,560 acres
Orders on record102011 to 2025; 8 changed something, 2 restated the rules
Most wells an order allows in the 640-acre unit9up from 4 in 2011
Horizontal wells with laterals in that unit66 active; started 2011 to 2021
Laterals that still fit3in 1 of the units; a count of space, not a plan

What happened on this land

The 640-acre unit was set up in 2011, with 4 horizontal wells allowed. Orders in 2015 and 2017 raised that to 9. 6 horizontal wells have laterals in it, started between 2011 and 2021.

482015202020254 wells9 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 640-acre unit (section 23). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2011
  2. Apr 20, 2011Unit set up

    Set up the 640-acre unit across section 23, with up to 4 horizontal wells allowed.

    Order 16707 · Case 14429 · Applicant: Enerplus Resources (U.S.A.) Inc.

  3. 2015
  4. Jul 20, 2015First on record

    First order on record for the 2,560-acre unit over sections 22, 23, 26 and 27, with up to 3 horizontal wells allowed.

    Order 24632 · Case 22299

  5. Jul 20, 2015More wells allowed

    Raised the 640-acre unit from 4 to 7 horizontal wells allowed.

    Order 25368 · Case 23035 · Applicant: Enerplus Resources (USA) Inc.

  6. 2016
  7. Aug 8, 2016Pooled

    Pooled the 2,560-acre unit over sections 22, 23, 26 and 27: the owners' interests across it are combined, and all share in its wells.

    Order 27553 · Case 25146 · Applicant: HRC Operating, LLC,

  8. 2017
  9. Oct 31, 2017More wells allowed

    Raised the 640-acre unit from 7 to 9 horizontal wells allowed.

    Order 28249 · Case 25833 · Applicant: Enerplus Resources (USA) Corp.

  10. 2021
  11. Jan 19, 2021Unit set up

    Set up the 2,560-acre unit over sections 14, 15, 22 and 23.

    Order 31178 · Case 28636 · Applicant: WPX Energy Williston, LLC

  12. Jul 29, 2021Well count set

    Allowed up to 1 lease-line well in the 2,560-acre unit over sections 14, 15, 22 and 23, running east–west.

    Allowed up to 3 lease-line wells in the 2,560-acre unit over sections 22, 23, 26 and 27, running north–south.

    Order 31189 · Case 28646

  13. 2024
  14. Jun 6, 2024Pooled

    Pooled the 2,560-acre unit over sections 14, 15, 22 and 23: the owners' interests across it are combined, and all share in its wells.

    Order 31892 · Case 29323 · Applicant: WPX Energy Williston, LLC

2 more orders restated the rules without changing them
  • Jul 20, 2015: Order 25875 (case 23535), HRC Operating, LLC
  • Jan 10, 2025: Order 33952 (case 31256), Enerplus Resources (USA) Corp.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

640 acresSection 23

Set up
Apr 2011 · Order 16707
Most wells an order allows
9 · 2017
Last real change
Oct 2017
Wells with laterals inside
6
Pool
Mcgregory Buttes-Bakken

2,560 acresSections 14, 15, 22 and 23

Set up
Jan 2021 · Order 31178
Lease-line wells
1
Last real change
Jun 2024
Wells with laterals inside
25
Oil reported
7,311,070 bbl
Laterals that still fit
3
Pool
Mcgregory Buttes-Bakken

2,560 acresSections 22, 23, 26 and 27

First order on record
Jul 2015 · Order 24632
Most wells an order allows
3 · 2015
Lease-line wells
3
Last real change
Jul 2021
Wells with laterals inside
29
Oil reported
8,995,195 bbl
Pool
Mcgregory Buttes-Bakken

Wells in the 640-acre unit

Horizontal wells with at least 660 ft of lateral inside section 23, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology