Section 25Township 148 North, Range 92 West

3 spacing units cover this section. The Industrial Commission signed 3 orders on them between 2016 and 2026, and 2 of those changed something.

At a glance

T148N R92WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · part of sections 25, 26, 35 and 36
  • 1,280-acre unit · sections 25 and 36
  • 1,920-acre unit · sections 24, 25 and 36
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section31,280 and 1,920 acres
Orders on record32016 to 2026; 2 changed something, 1 restated the rules
Most wells an order allows in the 1,280-acre unit over sections 25, 26, 35 and 363stated in 2016
Laterals that still fit17in 2 of the units; a count of space, not a plan

What happened on this land

The 1,280-acre unit over sections 25, 26, 35 and 36 first appears in the orders in 2016, with 3 horizontal wells allowed.

1232016201820202022202420263 wellsMost horizontal wells an order has allowed
The 1,280-acre unit over sections 25, 26, 35 and 36 (part of sections 25, 26, 35 and 36). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2016
  2. Jan 15, 2016First on record

    First order on record for the 1,280-acre unit over sections 25, 26, 35 and 36, with up to 3 horizontal wells allowed.

    First order on record for the 1,280-acre unit over sections 25 and 36, with up to 3 horizontal wells allowed.

    Order 26745 · Case 24378 · Applicant: QEP Energy Co.

  3. 2026
  4. Oct 12, 2026Unit set up

    Set up the 1,920-acre unit across sections 24, 25 and 36, with up to 4 horizontal wells allowed.

    Order 35518 · Case 32661 · Applicant: Oasis Petroleum North America LLC

1 more order restated the rules without changing them
  • Jan 15, 2016: Order 26746 (case 24379), QEP Energy Co.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresPart of sections 25, 26, 35 and 36

First order on record
Jan 2016 · Order 26745
Most wells an order allows
3 · 2016
Last real change
Jan 2016
Wells with laterals inside
0
Laterals that still fit
9
Pool
Heart Butte-Bakken

1,280 acresSections 25 and 36

First order on record
Jan 2016 · Order 26745
Most wells an order allows
3 · 2016
Last real change
Jan 2016
Wells with laterals inside
0
Laterals that still fit
8
Pool
Heart Butte-Bakken

1,920 acresSections 24, 25 and 36

Set up
Oct 2026 · Order 35518
Most wells an order allows
4 · 2026
Last real change
Oct 2026
Wells with laterals inside
1
Pool
Heart Butte-Bakken