2 spacing units cover this section. The Industrial Commission signed 6 orders on them between 2011 and 2015, and 4 of those changed something.
At a glance
2,560-acre unit · sections 13, 14, 23 and 24
3,840-acre unit · sections 13, 14, 23, 24, 25 and 26
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section22,560 and 3,840 acres
Orders on record62011 to 2015; 4 changed something, 2 restated the rules
Most wells an order allows in the 2,560-acre unit10up from 5 in 2011
Horizontal wells with laterals in that unit1414 active; started 2011 to 2020
Laterals that still fit2in 1 of the units; a count of space, not a plan
What happened on this land
The 2,560-acre unit first appears in the orders in 2011, with 5 horizontal wells allowed. An order in 2013 raised that to 10. 14 horizontal wells have laterals in it, started between 2011 and 2020.
The 2,560-acre unit (sections 13, 14, 23 and 24). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2011
Mar 15, 2011First on record
First order on record for the 2,560-acre unit across sections 13, 14, 23 and 24, with up to 5 horizontal wells allowed.
Order 15543 · Case 13267 · Applicant: Enerplus Resources (U.S.A.) Inc.
Oct 4, 2011Pooled
Pooled the 2,560-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 17461 · Case 15216 · Applicant: Marathon Oil Co.
2013
Jul 29, 2013First on record
First order on record for the 3,840-acre unit across sections 13, 14, 23, 24, 25 and 26, with up to 11 horizontal wells allowed.
Raised the 2,560-acre unit from 5 to 10 horizontal wells allowed.
Order 22380 · Case 20075 · Applicant: Marathon Oil Co.
2015
Sep 18, 2015Pooled
Pooled the 3,840-acre unit: the owners' interests across it are combined, and all share in its wells.
Order 26131 · Case 23790 · Applicant: Marathon Oil Co.
2 more orders restated the rules without changing them
Mar 15, 2011: Order 16548 (case 14272), Marathon Oil Co.
Jul 29, 2013: Order 22420 (case 20115), Marathon Oil Corp.
The units that cover it
A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.