Land · McKenzie County · T147N R103W

Section 8Township 147 North, Range 103 West

2 spacing units cover this section. The Industrial Commission signed 4 orders on them between 2005 and 2015, and 2 of those changed something.

At a glance

T147N R103WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 640-acre unit · section 8
  • 1,280-acre unit · sections 8 and 9
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section2640 and 1,280 acres
Orders on record42005 to 2015; 2 changed something, 2 restated the rules
Horizontal wells with laterals in that unit10 active; started 2005
Laterals that still fit4in 1 of the units; a count of space, not a plan

What happened on this land

The 640-acre unit was set up in 2005. 1 horizontal well has laterals in it, started in 2005.

  1. 2005
  2. Apr 20, 2005Unit set up

    Set up the 640-acre unit across section 8.

    Order 9969 · Case 8491

  3. 2010
  4. Sep 10, 2010Unit set up

    Set up the 1,280-acre unit across sections 8 and 9, with up to 1 horizontal well allowed.

    Order 14976 · Case 12715 · Applicant: Oasis Petroleum North America LLC

2 more orders restated the rules without changing them
  • Sep 10, 2010: Order 15003 (case 12742), Ursa Resources Group LLC
  • Dec 29, 2015: Order 24765 (case 22430), Emerald Oil, Inc.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

640 acresSection 8

Set up
Apr 2005 · Order 9969
Last real change
Apr 2005
Wells with laterals inside
1
Pool
Mondak-Bakken

1,280 acresSections 8 and 9

Set up
Sep 2010 · Order 14976
Most wells an order allows
1 · 2010
Last real change
Sep 2010
Wells with laterals inside
1
Laterals that still fit
4
Pool
Mondak-Bakken

Wells in the 640-acre unit

Horizontal wells with at least 660 ft of lateral inside section 8, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology