Land · McKenzie County · T147N R101W

Section 22Township 147 North, Range 101 West

2 spacing units cover this section. The Industrial Commission signed 11 orders on them between 2014 and 2026, and 6 of those changed something. Wells in the smallest unit have reported 125,020 barrels of oil.

At a glance

T147N R101WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 15 and 22
  • 1,920-acre unit · sections 15, 22 and 27
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section21,280 and 1,920 acres
Orders on record112014 to 2026; 6 changed something, 5 restated the rules
Most wells an order allows in the 1,280-acre unit7in 2016; the latest order read (2026) states 1
Horizontal wells with laterals in that unit11 active; started 2013
Oil those wells have reported125,020barrels, Jan 2003 to Aug 2026
Laterals that still fit4in these units; a count of space, not a plan

What happened on this land

The 1,280-acre unit first appears in the orders in 2014, with 1 horizontal well allowed. An order in 2016 raised that to 7. The latest order read, in 2026, states 1; a smaller number usually covers something narrower, not fewer wells for the unit. 1 horizontal well has laterals in it, started in 2013.

2462015202020251 well7 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 15 and 22). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2014
  2. Jul 31, 2014First on record

    First order on record for the 1,280-acre unit across sections 15 and 22.

    Order 20047 · Case 17778

  3. Jul 31, 2014Well count set

    Allowed up to 1 horizontal well in the 1,280-acre unit.

    Order 24253 · Case 21920

  4. Jul 31, 2014Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 24274 · Case 21941 · Applicant: Sequel Energy, LLC

  5. 2016
  6. Apr 18, 2016More wells allowed

    Raised the 1,280-acre unit from 1 to 7 horizontal wells allowed.

    Order 26912 · Case 24546

  7. 2026
  8. Jul 15, 2026First on record

    First order on record for the 1,920-acre unit across sections 15, 22 and 27, with up to 4 horizontal wells allowed.

    States up to 1 horizontal well for the 1,280-acre unit; an earlier order stated up to 7.

    Order 34732 · Case 31979 · Applicant: Burlington Resources Oil & Gas Co. LP

  9. Jul 15, 2026Pooled

    Pooled the 1,920-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 34982 · Case 32227 · Applicant: Burlington Resources Oil & Gas Co. LP

5 more orders restated the rules without changing them
  • Jun 22, 2026: Order 35499 (case 32642), Burlington Resources Oil & Gas Co. LP
  • Jul 15, 2026: Order 34961 (case 32206)
  • Jul 15, 2026: Order 34962 (case 32207)
  • Jul 15, 2026: Order 34963 (case 32208), Burlington Resources Oil & Gas Co. LP
  • Jul 15, 2026: Order 34964 (case 32209), Burlington Resources Oil & Gas Co. LP

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 15 and 22

First order on record
Jul 2014 · Order 20047
Most wells an order allows
7 · 2016
Latest count read
1 · 2026
Last real change
Jul 2026
Wells with laterals inside
1
Oil reported
125,020 bbl
Laterals that still fit
3
Pool
Bull Moose-Bakken

1,920 acresSections 15, 22 and 27

First order on record
Jul 2026 · Order 34732
Most wells an order allows
4 · 2026
Last real change
Jul 2026
Wells with laterals inside
1
Oil reported
125,020 bbl
Laterals that still fit
1
Pool
Bull Moose-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 15 and 22, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology