Land · McKenzie County · T146N R99W

Section 22Township 146 North, Range 99 West

One spacing unit covers this section. The Industrial Commission signed 3 orders on it in 2026, and 1 of those changed something. Wells in the unit have reported 130,129 barrels of oil.

At a glance

T146N R99WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 2,560-acre unit · sections 15, 22, 27 and 34
The outline is the spacing unit that covers this section.
Spacing units over this section12,560 acres
Orders on record32026; 1 changed something, 2 restated the rules
Most wells an order allows in the 2,560-acre unit4stated in 2026
Horizontal wells with laterals in that unit21 active; started 1990 to 2012
Oil those wells have reported130,129barrels, Jan 2003 to Aug 2026
Laterals that still fit4in this unit; a count of space, not a plan

What happened on this land

The 2,560-acre unit was set up in 2026, with 4 horizontal wells allowed. 2 horizontal wells have laterals in it, started between 1990 and 2012.

123419902000201020204 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 2,560-acre unit (sections 15, 22, 27 and 34). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2026
  2. Jul 27, 2026Unit set up

    Set up the 2,560-acre unit across sections 15, 22, 27 and 34, with up to 4 horizontal wells allowed.

    Order 35146 · Case 32375 · Applicant: White Rock Oil & Gas, LLC

2 more orders restated the rules without changing them
  • Jul 27, 2026: Order 35175 (case 32404)
  • Jul 27, 2026: Order 35176 (case 32405)

The unit that covers it

2,560 acresSections 15, 22, 27 and 34

Set up
Jul 2026 · Order 35146
Most wells an order allows
4 · 2026
Last real change
Jul 2026
Wells with laterals inside
2
Oil reported
130,129 bbl
Laterals that still fit
4
Pool
Ranch Creek-Bakken

Wells in the 2,560-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 15, 22, 27 and 34, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology