Land · McKenzie County · T146N R100W

Section 29Township 146 North, Range 100 West

2 spacing units cover this section. The Industrial Commission signed 2 orders on them between 2015 and 2021.

At a glance

T146N R100WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 28 and 29
  • 1,289-acre unit · sections 29 and 32
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section21,280 and 1,289 acres
Orders on record22015 to 2021; 2 changed something, 0 restated the rules
Most wells an order allows in the 1,280-acre unit4stated in 2021
Laterals that still fit5in 1 of the units; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2021, with 4 horizontal wells allowed.

12342022202420264 wellsMost horizontal wells an order has allowed
The 1,280-acre unit (sections 28 and 29). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2015
  2. Nov 18, 2015Pooled

    Pooled the 1,289-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 26499 · Case 24156

  3. 2021
  4. Apr 30, 2021Unit set up

    Set up the 1,280-acre unit across sections 28 and 29, with up to 4 horizontal wells allowed.

    Order 31271 · Case 28726 · Applicant: NP Resources, LLC

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 28 and 29

Set up
Apr 2021 · Order 31271
Most wells an order allows
4 · 2021
Last real change
Apr 2021
Wells with laterals inside
0
Laterals that still fit
5
Pool
Rough Rider-Bakken

1,289 acresSections 29 and 32

From the orders only; not in the state's current unit layer.

Last real change
Nov 2015
Wells with laterals inside
0
Pool
Rough Rider-Bakken