One spacing unit covers this section. The Industrial Commission signed 5 orders on it between 2004 and 2025, and 2 of those changed something. An order ended it.
At a glance
320-acre unit · part of section 4
The outline is the spacing unit that covers this section.
Spacing units over this section1320 acres
Orders on record52004 to 2025; 2 changed something, 3 restated the rules
Horizontal wells with laterals in that unit10 active; started 2004
What happened on this land
The 320-acre unit was set up in 2004. 1 horizontal well has laterals in it, started in 2004.
2004
Sep 22, 2004Unit set up
Set up the 320-acre unit across part of section 4.
Order 9761 · Case 8308 · Applicant: Lyco Energy Corporation
2025
Jun 17, 2025Unit ended
Ended the 320-acre unit.
Order 34508 · Case 31772 · Applicant: Phoenix Operating LLC
3 more orders restated the rules without changing them
May 24, 2005: Order 10036 (case 8477)
Nov 22, 2006: Order 10774 (case 9169)
Nov 26, 2014: Order 22473 (case 20167), GMX Resources Inc.
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.