One spacing unit covers this section. The Industrial Commission signed 4 orders on it between 2009 and 2026, and 2 of those changed something.
At a glance
1,280-acre unit · sections 31 and 32
The outline is the spacing unit that covers this section.
Spacing units over this section11,280 acres
Orders on record42009 to 2026; 2 changed something, 2 restated the rules
Most wells an order allows in the 1,280-acre unit1stated in 2015
Laterals that still fit5in this unit; a count of space, not a plan
What happened on this land
The 1,280-acre unit first appears in the orders in 2009. An order in 2015 allowed up to 1 horizontal well.
The 1,280-acre unit (sections 31 and 32). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
2009
Oct 29, 2009First on record
First order on record for the 1,280-acre unit across sections 31 and 32.
Order 13752 · Case 11428
2015
Feb 5, 2015Well count set
Allowed up to 1 horizontal well in the 1,280-acre unit.
Order 22870 · Case 20564
2 more orders restated the rules without changing them
Aug 17, 2026: Order 35180 (case 32409)
Aug 17, 2026: Order 35181 (case 32410), Phoenix Operating LLC
Read by machine, not checked by a person. Order facts come from the signed orders of the North Dakota Industrial Commission, signed through October 21, 2026. The signed order is the rule.
A record of orders, not title or current status. Nothing here says who owns anything, and a later order can change or end a unit.
Well counts are what each order states. A later order can state a smaller number for something narrower, such as one more well. These pages show the highest count and the latest one read; neither is a statement of what is allowed today.
By section. A unit appears when the orders describe its land by section numbers in one township. Units described by lots or quarter sections may be missing, and a unit smaller than its sections covers only part of them.
Oil is as first reported in the free NDIC Monthly Production Reports, January 2003 to August 2026, for horizontal wells with at least 660 ft of lateral inside a unit, whatever formation they produce from. Overlapping units count the same barrels.
Units and wells come from the state's free GIS layers (spacing units of October 17, 2026, wells of November 1, 2026). A well's status is the Industrial Commission's code, not a judgement.
Not legal, engineering or investment advice. Corrections: see contact.