Land · Billings County · T144N R98W

Section 4Township 144 North, Range 98 West

One spacing unit covers this section. The Industrial Commission signed 2 orders on it between 2020 and 2021. Wells in the unit have reported 715,347 barrels of oil.

At a glance

T144N R98WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 4 and 9
The outline is the spacing unit that covers this section.
Spacing units over this section11,280 acres
Orders on record22020 to 2021; 2 changed something, 0 restated the rules
Most wells an order allows in the 1,280-acre unit3stated in 2020
Horizontal wells with laterals in that unit43 active; started 2005 to 2024
Oil those wells have reported715,347barrels, Jan 2003 to Aug 2026
Laterals that still fit2in this unit; a count of space, not a plan

What happened on this land

The 1,280-acre unit was set up in 2020, with 3 horizontal wells allowed. 4 horizontal wells have laterals in it, started between 2005 and 2024.

123200520102015202020253 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 4 and 9). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2020
  2. Aug 25, 2020Unit set up

    Set up the 1,280-acre unit across sections 4 and 9, with up to 3 horizontal wells allowed.

    Order 31037 · Case 28517 · Applicant: Petro-Hunt, LLC

  3. 2021
  4. May 14, 2021Pooled

    Pooled the 1,280-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 31281 · Case 28735 · Applicant: Petro-Hunt, L.L.C.

The unit that covers it

1,280 acresSections 4 and 9

Set up
Aug 2020 · Order 31037
Most wells an order allows
3 · 2020
Last real change
May 2021
Wells with laterals inside
4
Oil reported
715,347 bbl
Laterals that still fit
2
Pool
Little Knife-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 4 and 9, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology