Land · Billings County · T142N R99W

Section 24Township 142 North, Range 99 West

3 spacing units cover this section. The Industrial Commission signed 6 orders on them between 2005 and 2026.

At a glance

T142N R99WNorth ↑ · each square is one section (1 mile)123456789101112131415161718192021222324252627282930313233343536
  • 1,280-acre unit · sections 24 and 25
  • 1,920-acre unit · sections 13, 24 and 25
  • 3,840-acre unit · sections 13, 14, 23, 24, 25 and 26
Units overlap. Each was set up by a different order and has its own well allowance.
Spacing units over this section31,280, 1,920 and 3,840 acres
Orders on record62005 to 2026; 6 changed something, 0 restated the rules
Most wells an order allows in the 1,280-acre unit8in 2013; the latest order read (2023) states 1
Horizontal wells with laterals in that unit43 active; started 1992 to 2024
Laterals that still fit5in these units; a count of space, not a plan

What happened on this land

The 1,280-acre unit first appears in the orders in 2005. An order in 2013 allowed up to 8 horizontal wells. The latest order read, in 2023, states 1; a smaller number usually covers something narrower, not fewer wells for the unit. 4 horizontal wells have laterals in it, started between 1992 and 2024.

24682000201020208 wellsMost horizontal wells an order has allowedWells started on the unit (one square each)
The 1,280-acre unit (sections 24 and 25). The line is the highest well count any order has stated so far: a ceiling, not wells drilled. Start dates are spud dates from the state's wells layer.
  1. 2005
  2. Sep 16, 2005First on record

    First order on record for the 1,280-acre unit across sections 24 and 25.

    Order 10182 · Case 8679 · Applicant: Headington Oil, Limited Partnership

  3. 2013
  4. Aug 23, 2013Well count set

    Allowed up to 8 horizontal wells in the 1,280-acre unit.

    Order 21431 · Case 19128 · Applicant: XTO Energy Inc.

  5. 2023
  6. Nov 28, 2023Unit set up

    Set up the 1,920-acre unit across sections 13, 24 and 25, with up to 4 horizontal wells allowed.

    Set up the 3,840-acre unit across sections 13, 14, 23, 24, 25 and 26.

    States up to 1 horizontal well for the 1,280-acre unit; an earlier order stated up to 8.

    Order 32910 · Case 30300 · Applicant: Continental Resources, Inc.

  7. Nov 28, 2023Pooled

    Pooled the 3,840-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 32925 · Case 30315 · Applicant: Continental Resources, Inc.

  8. Nov 28, 2023Pooled

    Pooled the 1,920-acre unit: the owners' interests across it are combined, and all share in its wells.

    Order 32927 · Case 30317 · Applicant: Continental Resources, Inc.

  9. 2026
  10. Jun 10, 2026Well count set

    Allowed up to 1 lease-line well in the 3,840-acre unit, running north–south.

    Restated the rules for the 1,280-acre unit.

    Restated the rules for the 1,920-acre unit (4 wells).

    Order 34570 · Case 31833 · Applicant: Continental Resources, Inc.

The units that cover it

A large unit can hold many more wells than its own order allows, because most of them belong to smaller units inside it. Oil totals overlap for the same reason.

1,280 acresSections 24 and 25

First order on record
Sep 2005 · Order 10182
Most wells an order allows
8 · 2013
Latest count read
1 · 2023
Last real change
Nov 2023
Wells with laterals inside
4
Laterals that still fit
3
Pool
St. Demetrius-Bakken

1,920 acresSections 13, 24 and 25

Set up
Nov 2023 · Order 32910
Most wells an order allows
4 · 2023
Last real change
Nov 2023
Wells with laterals inside
4
Oil reported
439,021 bbl
Laterals that still fit
1
Pool
St. Demetrius-Bakken

3,840 acresSections 13, 14, 23, 24, 25 and 26

Set up
Nov 2023 · Order 32910
Lease-line wells
1
Last real change
Jun 2026
Wells with laterals inside
6
Oil reported
649,429 bbl
Laterals that still fit
1
Pool
St. Demetrius-Bakken

Wells in the 1,280-acre unit

Horizontal wells with at least 660 ft of lateral inside sections 24 and 25, oldest first. Wells of any formation are listed.

Nearby

Sources and limits

Built November 12, 2026. Find another section · Cases & Orders · Methodology